Case study
- Customer
- Technology Company
- Industry
- Industry and Technology
- Lower Maintenance Costs
- 60%
- Weeks to Go-Live
- 6
- Faster Page Load
- 4x
Situation
The existing website was expensive to build and maintain — the effort and costs were disproportionate to the benefits.
Solution
As part of a client project, ATESO refreshed and rebuilt the website of International Technology.
Result
Significantly faster website loading and a radical cost reduction — both in the initial setup and in ongoing maintenance.
About the author
Engineering


